Shed Removal in Feilding
Most Feilding shed removals cost NZ$150 to NZ$1,200 NZD and take 2–4 hours on site. That includes taking the structure apart, carrying it out, recycling or disposing of it at licensed facilities and leaving the ground clear. You get a fixed written quote by email within 24 hours; jobs are booked five or more days ahead.
We're the go-to shed removal crew for homeowners across Feilding. From tired timber sheds to storm-damaged greenhouses, we dismantle safely, clear every last piece and leave your Manawatu-Wanganui garden ready to enjoy again.
Last updated
Get Your Free Quote
No obligation, fast response
How much does shed removal cost in Feilding?
Guide prices for typical Feilding jobs, shown in NZD. The quote we email is fixed, so the number you agree is the number you pay.
| Job | Time on site | Guide price (NZD) |
|---|---|---|
| Small shed (up to 8x6ft / 2.4x1.8m) | 1–2 hours | NZ$150 – NZ$400 |
| Medium garden shed (8x6ft to 10x8ft) | 2–4 hours | NZ$300 – NZ$650 |
| Large shed, workshop or summerhouse | 4–7 hours | NZ$550 – NZ$1,200 |
| Greenhouse (glass or polycarbonate) | 1–3 hours | NZ$180 – NZ$500 |
| Sectional concrete garage | 3–8 hours | NZ$700 – NZ$1,800 |
| Concrete base or slab breakout | +2–5 hours | +NZ$250 – NZ$900 |
| Asbestos cement / fibro sheeting (licensed handling) | +2–6 hours | +NZ$450 – NZ$1,500 |
What moves the price of a Feilding job
- Size of the shed, garage or greenhouse
- How the structure is fixed down (bolts, footings, poured slab)
- Distance from the structure to where we can legally park
- Glass or fragile panels that need careful bagging
- Extra items — decking, fencing, pergolas removed in the same visit
What does shed removal in Feilding include?
Every job in Feilding starts with a free on-site or photo-based quote. We agree the price up front, book a slot that suits you, then send an insured two-person crew to strip, load and haul away — anywhere in Manawatu-Wanganui.
What we remove in Feilding
- Rotten timber sheds and workshops
- Rusted metal and Colorbond sheds
- Broken glass greenhouses (safely bagged)
- Old decking, pergolas and gazebo frames
- Playhouses, log stores and outdoor toilets
Why Feilding homeowners choose us
We've built our Feilding reputation on turning up on time, quoting honestly and leaving sites spotless. No hidden fees, no dumped waste, no half-finished jobs. Typical Feilding clearances start around NZ$150 to NZ$1,200 NZD and are wrapped up in a single visit.
Garden sheds of every size
From 6x4 tool stores to 20ft workshops, we hand-demolish rather than machine-smash, which keeps noise and damage down on tight Feilding plots.
Garages and outbuildings
Single-skin block, timber-frame and sectional concrete garages are dismantled in sequence, with roof sheeting handled first and safely.
Greenhouses and poly-tunnels
Glazing bars, panes, staging and anchor bolts are removed in full — including the buried frame edges people usually leave behind.
Bases, slabs and footings
Concrete pads, paving and hardcore beneath the structure can be broken out and hauled away in the same Feilding visit.
What types of sheds are common in Feilding?
Colorsteel and steel garden sheds
Widely used in Manawatu-Wanganui; quick to unbolt and recycle.
Timber sheds and sleep-outs
Often older weatherboard structures on timber piles.
Fibrolite sheds and garages
Pre-1990 builds may contain asbestos and are checked first.
Glasshouses
Glass is taped and lifted out before the frame is dismantled.
Do you need council permission to remove a shed in Feilding?
Demolishing a small detached shed in Feilding is normally exempt from building consent. Check with your city or district council if the site has heritage protection or the building is attached to the house.
Asbestos rules in Manawatu-Wanganui
Older sheds and garages in Manawatu-Wanganui sometimes contain asbestos fibrolite. Under WorkSafe New Zealand rules, more than 10 square metres of non-friable asbestos needs a Class B licence and any friable asbestos needs a Class A licence.
Tips, transfer stations and recycling for Feilding waste
Waste from Feilding goes to council transfer stations and resource recovery parks. Steel is recycled, clean timber is separated, and asbestos goes only to sites licensed to take it.
How does a Feilding shed removal work?
01Step 1 — Enquiry
Tell us what's in the garden: shed, greenhouse, decking, garage or a combination, plus your Feilding address for routing.
02Step 2 — Quote
A written, itemised price lands in your inbox within a day. Base removal and contents clearance are listed separately so you can add or drop them.
03Step 3 — Scheduling
We book a date that suits you, minimum five days ahead, and confirm access requirements and parking in advance.
04Step 4 — Removal day
Hand-demolition, sorted loading, licensed disposal and a swept site. Most single-shed Feilding jobs are finished in a few hours.
Access and parking in Feilding
Many Feilding gardens back onto lanes or shared access, and some Manawatu-Wanganui properties have steps, slopes or raised patios between the shed and the road. None of that is a problem — it just changes how we crew the job, which is why we ask for photos of the access route as well as the structure.
Getting ready for removal day
- Take out tools, bikes and garden furniture (or ask us to clear them)
- Isolate power at the consumer unit if the shed is wired
- Trim back overhanging branches blocking the route
- Confirm parking — permits, bays or a shared drive
- Keep pets and children indoors while we work
Where does your old Feilding shed end up?
We are licensed waste carriers, and every Feilding load is tracked to a permitted transfer station — you can request the paperwork. Timber, steel sheeting, glass and hardcore are separated on site where space allows, which keeps disposal costs down and keeps the majority of your old Manawatu-Wanganui shed out of the ground.
Which areas near Feilding do we cover?
We don't stop at the Feilding boundary. These neighbouring Manawatu-Wanganui areas are covered by the same team, on the same terms.
- Shed removal Whanganui
- Shed removal Levin
- Shed removal Foxton
- Shed removal Dannevirke
- Shed removal Marton
- Shed removal Palmerston North
See every town we cover in Manawatu-Wanganui or all shed removal locations in New Zealand.
Feilding shed removal: frequently asked questions
Do I need to be home when you remove the shed in Feilding?
Not always. If we have safe access to the Feilding property and the shed is empty, we're happy to complete the job while you're at work. We'll send photos before and after and take payment once you're satisfied.
Can you also remove the concrete base in Feilding?
Yes. Base removal — concrete slabs, paving, timber bearers — is offered as an add-on when we quote your Feilding job. We break it up, load it out and leave the ground level and ready for its next use.
Do you clear the contents of the shed too?
We can. Let us know when you request your Feilding quote and we'll price in clearing the contents (old tools, bikes, garden furniture) alongside the structure itself.
What size sheds can you remove in Feilding?
Anything from a 6x4 tool shed to a double garage-sized workshop. Small timber and metal sheds are usually a half-day job; larger workshops, multi-bay structures and anything with a concrete base or asbestos-cement roof sheeting take longer and are priced accordingly after we see photos of the Feilding site.
Do you need access through the house?
Usually not. Most Feilding properties have side or rear access we can carry materials through, and we bring barrows and dust sheets. Where the only route is through the property we protect floors and doorways first — just flag it when you request your quote so we allow the extra time.
What do I need to do before the crew arrives?
Empty the shed of anything you want to keep, unplug and disconnect any power or water feeds, and make sure there's a clear route from the shed to where we can park in Feilding. If you can't clear the contents, tell us and we'll price that in rather than turning up short of time.
Is there a minimum notice period?
Yes — we ask for a minimum of five days between your quote being accepted and the Feilding job date so we can route the crew and book disposal capacity. Urgent jobs are sometimes possible if a slot opens up; mark your enquiry "urgent" and we'll let you know.
Do I need permission to remove a shed in Feilding?
Demolishing a small detached shed in Feilding is normally exempt from building consent. Check with your city or district council if the site has heritage protection or the building is attached to the house.
Which transfer station or resource recovery park does waste from Feilding go to?
Waste from Feilding goes to council transfer stations and resource recovery parks. Steel is recycled, clean timber is separated, and asbestos goes only to sites licensed to take it.
